Skip to content

L2/L3 Ready

This is the transient state between L0 and actually entering L2 or L3.

Entering L2/L3 Ready

This happens after software put all the downstream components into D3Hot, and all the Links further downsteam have been in L1 state.

System software broadcasts PME_Turn_Off downstream to quiese PME first. This put the Link briefly into L0 state. The PME_To_Ack from downstream components are gathered and routed upstream.

Once all the downstream components ack, in each individual Links the components exchange PM_L23_Ready DLLP and PM_Request_Ack DLLP, then both side enters electrical idle.

References

Videos

Specification

  • 5.3.2 PM Software Control of the Link Power Management State
  • 5.3.2.3 Entry into the L2/L3 Ready State